Coastal Area Cabinet

Coastal Area Cabinet

IP level:IP45
Place of Origin:Shandong, China
Brand Name:QHECO
Installation Type:Floor standing
Delivery time:5-10 Days
Send Inquiry
Description

Key Attributes

 

IP level

IP45

Type

Control Box

Place of Origin

Shandong, China

Model Number

Distribution Cabinet

Brand Name

QHECO

Product Name

GGD Control Cabinet

Installation Type

Floor standing

Color

Silver

Delivery time

5-10 Days

Certificate

CCC, ISO9001

Material

Cold-rolled Steel

Thickness

1.8/2.0 mm

Sample

Available

Service

OEM ODM

 

GGD04
GGD2

Company Profile

 

06

05

08

07

09

 

Question&Answer

 

1. Who are you?

Located in Shandong, China, we are an OEM/ODM enterprise founded in 2006; With 18 years of production experience, we are a high-tech enterprise specializing in the research and production of high and low voltage power transmission and distribution equipments.

2. What can I buy from you?

Various high and low voltage distribution boxes, customized distribution equipment, power distribution set.

3. Why should I buy from you not from other suppliers?

Qinghua ECO has 18 years of professional production experience and lightning speed delivery.

4. Can I get a sample to check your quality?

Of course. After price confirmation, you can require for samples to check our quality. We will provide you sample for free (value
under USD15), as long as you afford the express freight.

5. How can I order customized products?

The best way is that you give us engineering drawings and equipment list, we will arrange engineers to serve you. If there is no
drawings, we will also provide solutions for you.

6. How do you guarantee the quality?

Material inspection: Check the material surface and roughly dimension;
First Production inspection: To ensure the critical dimension in mass production.;
Sampling inspection: Check the quality before sending to the warehouse.;
Pre-shipment inspection: 100% inspected by QC assistants before shipment.

7. How about the lead time?

Generally 1-2 weeks for samples, 3-4 weeks for mass production.

8. What will you do if we receive poor quality parts?

Please send us the pictures and our engineers will rebuild it for you in the fastest time possible.

 

Hot Tags: coastal area cabinet, China coastal area cabinet manufacturers, factory

Send Inquiry